Customization: | Available |
---|---|
Application: | Plant Flower Roots etc |
Certification: | CE |
Still deciding? Get samples of US$ 26000/Set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model
|
TQ-500
|
TQ-1200
|
TQ-2000
|
TQ-3000
|
TQ-4000
|
TQ-6000
|
TQ-8000
|
TQ-10000
|
Volume (L)
|
600
|
1200
|
2300
|
3200
|
4300
|
6300
|
8500
|
11000
|
Design pressure in tank(Mpa)
|
0.09
|
|||||||
Jacket design pressure(Mpa)
|
0.3
|
|||||||
Manhole diameter (mm)
|
400
|
400
|
400
|
500
|
500
|
500
|
500
|
500
|
Heating area(m2)
|
1.7
|
3
|
4.7
|
6.3
|
8
|
12
|
14
|
16
|
Condensation area(m2)
|
4
|
5
|
8
|
10
|
15
|
20
|
25
|
30
|
Cooling area(m2)
|
0.5
|
1
|
1
|
1.5
|
2
|
2
|
3
|
4
|
Slag door diameter(mm)
|
500
|
800
|
800
|
800
|
1000
|
1400
|
1400
|
1600
|
Steam consumption(kg/h)
|
160
|
245
|
325
|
345
|
430
|
645
|
720
|
850
|
Water consumption(T/h)
|
6
|
8
|
10
|
15
|
20
|
25
|
30
|
40
|
Motor Power(KW)
|
2.2
|
3.0
|
4.0
|
5.5
|
5.5
|
7.5
|
11
|
15
|
Stirring speed(r/min)
|
36
|
36
|
36
|
36
|
36
|
36
|
36
|
36
|
1. Q : How can customer know the processes of order?
A : We will take photo or video during manufacturing every two weeks to make customer clear about the order. When goods is finished,we will take more detailed photos or video for inspect. You can also come to our factory to inspect by yourself.
2. Q : Do you supply installation equipment in oversea?
A : Yes, if need, we can also send our installation engineer to your factory to help you do installation and testing. And you need to provides round-trip ticket and accommodation for our engineer. The extra salary of one installation engineer is 200USD/day.
3. Q : How to control quality?
A : All material we use has material certification. Before any piece of equipment leaves
Gaokang. It goes through a complete quality and assurance control inspection. This inspection assures your equipment meets all specifications and is in proper working order before it leaves our facility and arrives at your door.
4. Q : What is the shipment schedule?
A : We will send you photographs of your order being loaded into the shipping container at the factory. The shipping container will generally leave port 3-4 days after loading. We will send you a bill of lading and final statement of account within one week of that time. The bill of lading will include the shipping container numbers. You can track your shipping container. Approximately 10 days prior to delivery, we will send you an ETA (Estimated Time of Arrival) notice from the shipping time. Please remember that the listed delivery date is only an estimate, and is subject to port unloading schedules, customs processing, and the dictates of the local delivery truck company. You will be directly contacted by the shipping company's local truck delivery services approximately 48 hours prior to the date of delivery to schedule a delivery time. If you need to delay the final delivery, there will be a "pull" fee of approximately $100, and a storage fee of approximately $150 per shipping container per day.
GAOK design and manufacture extraction prodcution line for users in need of a simple device for small amounts of extract, as well as more complex equipment for industrial use. Our offer includes preprocess(dryer /grinder) ,coating machine ,package machine and process systems where the substance used as solvent is either a volatile hydrocarbon (butane extraction), an alcohol (alcohol extraction), or CO2 (supercritical extraction). Given the investment cost, complexity of use, and extract quality, each system has some advantages and disadvantages.